FLOW Project leader, Jane, talks us through a photo diary of changes made to Haydons Pond, in Almodington.

This relic pond was identified for improvement during the ditch surveys of Earnley parish. This thick willow copse hid an old dried up pond that could be seen on 1846 tithe maps and which can help to create, with management, wetland habitat for wildlife. Before any work took place, the site was surveyed for water voles and bats. Trees were marked where they had bat features, and these will be left or only gently lifted, avoiding any holes, cracks or splits.

21 November 2018

This relic pond was covered in large mature willow that had fallen and regrown and has bramble growing all through it. These were the plant species that dominated. There are mature oaks to one side of the pond that will be left. The area to the side of the pond was cleared so that the tree surgeons will have somewhere to park and work from.

This relic pond was covered in large mature willow that had fallen and regrown and has bramble growing all through it. These were the plant species that dominated. There are mature oaks to one side of the pond that will be left. The area to the side of the pond was cleared so that the tree surgeons will have somewhere to park and work from.

4-7 December 2018

Tree surgeons went in and took out some of the mature willows and lowered the height of some of those remaining. They targeted the willows hanging over the road and a couple in the pond itself. A fringe of blackthorn was kept along the front as a margin and a couple of stands of hazel were left at the back. The pond is now full of water therefore will not be dug out until it dries out again.

Tree surgeons went in and took out some of the mature willows and lowered the height of some of those remaining. They targeted the willows hanging over the road and a couple in the pond itself. A fringe of blackthorn was kept along the front as a margin and a couple of stands of hazel were left at the back. The pond is now full of water therefore will not be dug out until it dries out again.

12 December 2018

Picked up all the debris and dead wood left on site by the tree surgeons, raked up the debris out of the water and had a fire to get rid of some of the brash. Created a line of dead material ready to rot down and provide a good basis for a new hedge. Tidied up and build up the dead hedge adjacent to the site

Picked up all the debris and dead wood left on site by the tree surgeons, raked up the debris out of the
water and had a fire to get rid of some of the brash. Created a line of dead material ready to rot down and
provide a good basis for a new hedge. Tidied up and built up the dead hedge adjacent to the site.

Work for 2019

A contractor will be engaged to dig out this pond and to create some deep areas where water will be held for longer. This site will be monitored to keep an eye on water levels and where possible wetland plants will be added to increase the range of species colonising this site. Species surveys over the spring and summer will also be carried out and once the digging work is done, coir rolls will also be installed.


Post by Jane Reeve

This entry was posted in _Blogs, _News, FLOW Project. Bookmark the permalink.