Tile Barn Lane Story

This relic ditch was identified for improvement during the ditch surveys of East Wittering and Bracklesham parish. This ditch was very overgrown with willows but also had mature oaks and some hazel, hawthorn and blackthorn along its far banks. The ditch itself was large but very shallow and dark with no wetland vegetation present. There had been significant flooding in the road in 2012 / 2013 and we identified potential for this ditch to hold more water and also be opened up so that a greater range of plants would colonise the banks.

Our wetland management work is carried out by our FLOW Project. Read about the FLOW project or see our next work date for this site on our calendar.

 

02 February 2018

Ditch checked for water voles and other species. Identified key trees to protect and areas where deepening would be beneficial.

Ditch checked for water voles and other species. Identified key trees to protect and areas where deepening would be beneficial.

10 February 2018

Stakes and binders were brought onsite and dead and cut material used to create a dead hedge

Stakes and binders were brought onsite and dead / cut material used to create a dead hedge

28 February 2018

Trees cut on the verge side of the bank to get light onto the ditch area. Removal of willow and overhanging branches.

Trees cut on the verge side of the bank to get light onto the ditch area. Removal of willow and overhanging branches.

23 March 2018

Hedge planting of mixed native trees, with rabbit guards and stakes. Dead hedging continued to provide a barrier from the wind.

Hedge planting of mixed native trees, with rabbit guards and stakes. Dead hedging continued to provide a barrier from the wind.

19 April 2018

Species survey to see how the ditch has reacted to the increase in light and the removal of some trees. water seen has an algal bloom on it.

Species survey to see how the ditch has reacted to the increase in light and the removal of some trees. water seen has an algal bloom on it.

17 October 2018

Bramble cutting and undergrowth clearing of the ditch channel to open it up and to get light onto the ditch channel. A fire was set in the base of the ditch to get rid of the small debris and some of the willow growth.

Bramble cutting and undergrowth clearing of the ditch channel to open it up and to get light onto the ditch channel. A fire was set in the base of the ditch to get rid of the small debris and some of the willow growth.

19 October 2018

Bramble cutting and undergrowth clearing of the ditch channel to open it up and to get light onto the ditch channel. A fire was set in the base of the ditch to get rid of the small debris and some of the willow growth.

Tree cutting and clearance to continue the recovery of this large relic ditch

14 November 2018

A contractor has been brought in to dig out this ditch and to create some deep areas where water will be held for longer.

Work for 2019

During early 2019, this site will have dry coir rolls installed and these will be planted with a range of wetland plant species. The water levels will be monitored to see if any further digging or management is required and over the spring and summer species surveying will be continued.

Become a FLOW volunteer or see our next work date for this site on our calendar.


Post by Jane Reeve

This entry was posted in _Blogs, _News, FLOW Project. Bookmark the permalink.